Tolerable Risk – IEC 62305-2
In performing risk assessment as an essential step in the application of IEC 62305, the calculated risk of loss due to lightning shall be below the tolerable level. Tolerable risk …
Filipino Professional Electrical Engineer
In performing risk assessment as an essential step in the application of IEC 62305, the calculated risk of loss due to lightning shall be below the tolerable level. Tolerable risk …
Risk assessment is a essential step in the application of IEC 62305. Risk assessment is required to determine the need and extent of protection measures to reduce the risk of …
Human activities have been a major factor to the greenhouse gas (GHG) emissions. GHG emissions increased significantly since before the advent of the Industrial Revolution. GHG emissions contribute to the …
IEC 62305 identifies four main sources of damage: S1 Flashes to the structure mechanical damage, fire and/or explosion due to the hot lightning plasma arc, over-heated conductors or melted metal; …
The design of a Lightning Protection System (LPS) should be technically and economically optimized. Clause 4.2 Design of the LPS in IEC 62305-3 – Protection against lightning Part 3: Physical …